• Decisions of High Board of Privatization dated 19.12.2012
numbered 2012/184, 2012/185, 2012/186, 2012/187, 2012/188,
2012/189, 2012/190, 2012/191 and 2012/192 regarding the
transfer of the operating rights of respectively Group 1- Engil,
Erciş and Hoşap Hydroelectric Power Plants and Group 2-
Koçköprü Hydroelectric Power Plant to Tahiroğulları Petrol
Ürünleri Nakliyat İnşaat Otomotiv ve Taahhüt Sanayi ve Ticaret
Ltd. Şti.; Group 3- Kısık Hydroelectric Power Plant to Kılıç
Enerji Üretim A.Ş.; Group 4- Göksu Hydroelectric Power Plant
to Nurol Enerji Üretim ve Pazarlama A.Ş.; Group 5- Bozkır and
Ermenek Hydroelectric Power Plants to Özbey Hijyenik Ürün-
leri Sanayi ve Ticaret A.Ş.; Group 7- Hasanlar Hydroelectric
Power Plant to Batıçim Enerji Elektrik Üretim A.Ş.; Group 8-
Ladik-Büyükkızoğlu and Durucasu Hydroelectric Power Plants
to Met Enerji Üretim İnşaat Taahhüt Turizm Sanayi ve Ticaret
A.Ş., Group 9- Arpaçay-Telek and Kiti Hydroelectric Power
Plants to Metaltek Metalurji Kimya Gıda Sanayi ve Ticaret Ltd.
Şti., Group 1- Berdan Hydroelectric Power Plant to Tayfurlar
Enerji Elektrik Üretim A.Ş. was published in the Official
Gazette dated 20.12.2012 and numbered 28503.
480
NEWSLETTER 2012